As the premier design build bridge fabricator in the Western United States, we have provided support and strength to design build contractors during the proposal, conceptual design, final design and construction phases of their projects.
Major Recent Design Build Projects
1.5 billion dollar I-15 Corridor | 80 bridges - 40,000 tons. |
460 million dollar Legacy Parkway | 8 bridges - 12,000 tons. |
150 million dollar SR 201 | 2 bridges - 2,000 tons |
6 million dollar 45th So over I-215 | Bridge moved into place using SPMT transport |
150 million I-15 Ogden NOW Reconstruction | 3 bridges 1,800 tons |
3 million I-80 Echo Bridge replacement | 2 bridges fully constructed & slid in place 135 day completion time |
5 million dollar 3300 S over I-215 | Bridge moved into place using SPMT transport |
16 million dollar I-80 Mountain Dell | 2 bridges moved into place using SPMT transport |
80 million dollar I-84 Riverdale Road | Fast track bridge using accelerated bridge construction at the site |
130 million dollar I-80 Reconstruction | 15 bridges moved into place using SPMT transport |
150 million dollar 114th South | Bridge over Jordon River |
61 million dollar South Layton Interchange | SPUI Bridge erected by the launching method |
I-15 Reconstruction Design Build
80 complex steel bridges and 40,000 tons
I-80 Reconstruction Design Build
7 bridges ready to be moved into place using SPMT carriers.
4500 S over I215 Design Build
Completed bridge beign moved in to place using a SPMT carrier
Echo Bridge Design Build
Bridges being slid into place
Legacy Parkway Design Build
8 complex curved bridges 12,000 tons